
Heavy Civil
The Fort Lauderdale-Hollywood Terminal 5 Expansion
Client
Turner Construction Company (Miami, FL)
Project Owner
The Fort Lauderdale-Hollywood International Airport
Location
Fort Lauderdale, Florida
Project Value
$404,000,000
Industry
Heavy Civil
Account Executive(s)
Tom Thomas, Trey Wilson
Services Provided
Construction Logistics Animations |
Renderings & Animations |
Still Renderings |

Heavy Civil
The Fort Lauderdale-Hollywood Terminal 5 Expansion
Client
Turner Construction Company (Miami, FL)
Project Owner
The Fort Lauderdale-Hollywood International Airport
Location
Fort Lauderdale, Florida
Project Value
$404,000,000
Industry
Heavy Civil
Account Executive(s)
Tom Thomas, Trey Wilson
Services Provided
Construction Logistics Animations |
Renderings & Animations |
Still Renderings |

Project Overview
Fort Lauderdale-Hollywood International Airport undertook the construction of Terminal 5, a new 180,000 square foot concourse at the airport's east end, with a total project value of $404,000,000. The expansion added five new gates with designated hold rooms, a TSA checkpoint, ticketing counter, curbside expansion, concessionaires, ramp aircraft parking, and an in-line hydrant fueling system. A multistory passenger bridge connected the new terminal to Terminal 4, and a new ground transportation center served both facilities. The client pursued the construction management contract and engaged PRESWERX to develop a competitive pursuit package. PRESWERX delivered a written proposal, renderings, and animations to support the bid.

Client Challenges
A $404,000,000 airport terminal expansion is one of the most complex and scrutinized construction pursuits in the public infrastructure sector. The client needed to demonstrate mastery of an intricate program to an owner with zero tolerance for ambiguity or underpreparedness:
Communicating the full scope of a 180,000 SF active aviation facility, including airside, landside, and passenger circulation systems, as a single coherent construction narrative.
Giving the airport owner a vivid, accurate preview of the completed terminal environment before any construction began in a live, operational airport setting.
Producing a written proposal that met the rigor of a major public aviation procurement while clearly distinguishing the client's team from other highly qualified competitors.
Each element of the pursuit package had to reflect the complexity of the project and the professionalism the airport authority expected at this scale.

Scope of Work
PRESWERX delivered a comprehensive pursuit package for the client's Terminal 5 Expansion bid. The written proposal was structured to address the airport authority's selection criteria, presenting the client's construction management approach, aviation experience, and understanding of the program's operational complexity. Renderings captured the new terminal's exterior and key interior environments, including the gate hold rooms, TSA checkpoint, ticketing areas, and concession spaces, giving the owner a detailed picture of the finished facility. Animations brought the construction sequence and spatial relationships to life, illustrating how Terminal 5 would connect to Terminal 4 and integrate into the airport's existing operations throughout the build.


PRESWERX Approach
PRESWERX approached this engagement with the depth of focus that a $404,000,000 aviation pursuit demands. Every deliverable was built to communicate the client's command of a program where operational continuity, safety, and phasing complexity are as important as the finished building.
Developed a proposal that addressed the airport authority's criteria directly, leading with the client's aviation construction experience and their approach to managing a live-airport build.
Produced renderings of the terminal's airside and landside environments, capturing the passenger experience from curbside arrival through gate hold rooms and onto the aircraft ramp.
Created animations that illustrated the construction sequence and the multistory bridge connection between Terminal 4 and Terminal 5, making the phasing logic clear to a technically sophisticated owner.
The result was a pursuit package that matched the ambition and complexity of one of South Florida's most significant aviation infrastructure investments.
Results Delivered
PRESWERX delivered a complete, multi-component pursuit package for a $404,000,000 public aviation terminal expansion, produced at the standard of a client competing for one of the largest construction contracts in Fort Lauderdale-Hollywood International Airport's history.
The proposal gave the airport authority a rigorous, well-organized document that demonstrated the client's construction management capability and aviation program fluency.
Renderings and animations gave the owner a detailed, accurate preview of Terminal 5 across airside, landside, and passenger circulation environments.
The complete package positioned the client with a professional, polished submission that reflected the scale and seriousness of a landmark aviation pursuit.
The client entered the selection with a comprehensive pursuit package that demonstrated full command of a complex aviation program and the professionalism the airport authority expected.


SUCCESS STORIES
Proven Results Across High-Stakes Pursuits
Explore how we’ve helped leading A/E/C teams craft standout proposals and presentations, build confidence, and win major projects with strategy, storytelling, smart visuals, and coaching.


.png)


